+ 44 (0)20 8614 6200
info@corbett.co.uk
+ 44 (0)20 8614 6200
info@corbett.co.uk
Cornerstone Seminars
FIDIC
Knowledge Hub
+ 44 (0)20 8614 6200
info@corbett.co.uk

FIDIC 2017 – A Practical Legal Guide – Errata

By |May 28th, 2021|

Page Corrigenda 146 For provisions referring to sub-clause 3.7, see sub clauses 1.1.29, 1.1.57, 148 Clause 3 of the FIDIC Emerald Book 2019 … 348 Footnote 1: FIDIC’s Emerald Book 2019 … 353 Delete sentence " There is a discussion under Sub-Clause 17.6 of its implications." 364 It should be noted that sub-clause 1.15 of the Contract limits liability.... 374 In the FIDIC 2017 suite, the Engineer must state only what is wrong, the relevant contractual clause, and by when it must be fixed; … 381 The right to terminate if the Contractor assigns or subcontracts the Contract without the Employer’s

Africa

By |September 10th, 2019|

Experience includes: Road projects in Ethiopia, Malawi, Kampala, Uganda Building projects in Libya, Egypt, Sudan Energy and power projects in Uganda, Tunisia, Kenya, Sudan, Tanzania, Egypt, Ethiopia, Rwanda Airport projects in Ethiopia Heavy industrial projects in Egypt, West Africa, Uganda Advising on the call of bonds in Uganda, Rwanda Advising on bonds/guarantee conditions in Zambia, Rwanda Advising on contract conditions in Niger, Armenia, Rwanda Negotiating contract terms on a windfarm in Kenya Port project in Togo Water project in Malawi ICC arbitration against a contractor in relation to the construction of elements of a port in Morocco

Go to Top